Technical Guide
Technical Guide

EMS Control Logic: Turning Economy and Reliability into SOC Rules

Summary: EMS is strategy and coordination; PCS is execution and conversion. SOC banding, peak-valley arbitrage, anti-backflow and remote O&M with AEMS.

EMS vs PCS division

EMS is "strategy and coordination"; PCS is "execution and conversion" — clear roles make planning efficient.

SOC banding (confirm on site)

  • SOC high 80–100%: prioritise load/peak shaving; allow surplus to grid.
  • SOC normal 30–80%: renewables first, battery smooths power, charge/discharge by tariff.
  • SOC low 20–30%: limit discharge; prepare diesel or grid top-up.
  • SOC too low <20%: protective mode; diesel/grid forced top-up; keep critical loads.

Core functions

Self-consumption, surplus to grid, peak-valley arbitrage (time function), self-use+backup, meter anti-backflow, remote monitoring/waveform/upgrade/alarm. VGRID AEMS100/200/300/400/500 dispatches PCS, BMS, PV, grid, diesel and loads, with cloud access.

Reminder

SOC thresholds are not fixed — set them with backup goals, load criticality, tariffs, diesel cost and battery strategy.

FAQ

Can EMS directly control the PCS?

Yes. Via RS485/CAN/4G it dispatches PCS, BMS, STS and diesel, executing charge/discharge and transfer strategies.

How is peak-valley arbitrage realised?

EMS charges in off-peak and discharges in peak by tariff, under anti-backflow and backup constraints.

Is EMS required for anti-backflow?

For grid-tied sites that must not export, anti-backflow (meter + EMS strategy) is required.

How many devices does AEMS manage?

Up to 6 PCS and 6 MPPT, with WiFi/4G cloud comms and local HMI.

Products